logo
products
PRODUCTS DETAILS
Home > Products >
Production Line Upgrade/Automotive EPC

Production Line Upgrade/Automotive EPC

MOQ: Negotiable
Price: Negotiable
Standard Packaging: Packed with plastic films and wrap with strips
Delivery Period: According to customer's requirement
Payment Method: Negotiable
Supply Capacity: Strong production capacity
Detail Information
Place of Origin
China
Brand Name
CEI-Kinte
Certification
ISO9001/FEM/ISO14001/OHSAS 18001
Model Number
Customized
EPC:
Engineering Procurement Construction
Press Shop:
Consulting
Body Shop:
Main/Closures/Floor/Sub-assembly/Metal Finishing
Paint Shop:
PT/ED Line/Primer Top Paint
Assembly Shop:
Trim/Sub-assembly/Testing
Engineering:
Plant Planning, R&D, SE
Production Capacity:
Improvement
Simulation:
PDPS
Overall Planning:
General Layout, Analysis Drawings
After-sale Service:
24/24 7/7
Highlight:

ISO9001 Automotive EPC

,

Automotive EPC ISO9001

,

ISO9001 Production Line Upgrade

Product Description

Introduction Of New Models

Introduction of new models for welding lines, to realize collinear production of new models and original models

 

Capacity Improvement

Improvement of line productivity, to convert and upgrade the low-beat lines to high-beat lines

 

Old Line Relocation

Introduction of new models for welding lines, to realize collinear production of new models and original models

 

Manual Operation Converted To Automatic Operation

Change manual operation to automatic operation. Transform the manual loading station into automatic loading station. Transform the manual welding station into automatic welding station. Transform the manual gluing station into automatic gluing operation, etc.

 

Intelligent Transformation

By incorporating MISP industrial big data system, the line beats can be optimized and the failure rate can be lower.

 

TRANSFORMATION PROCESS

01 Preparation Before Transformation

1. Full demonstration and innovation of process plan

2. Sufficient on-site surveying and mapping, logistics confirmation

3. Detailed construction plan

4. Rigorous project plan

5. Personnel and materials management

6. Standard project management; standard documents, SAP

 

02 Management During Transformation

1. Mobilization before construction

2. Daily work arrangement and confirmation

3. Safety management

4. Emergency plan

5. Logistics support, customer support, logistics support, customer support

 

03 Summary After Transformation

1. 24-hour production accompany

2. Quick response to problem points

3. Summary and standardization

 

Production Line Upgrade/Automotive EPC 0Production Line Upgrade/Automotive EPC 1

products
PRODUCTS DETAILS
Production Line Upgrade/Automotive EPC
MOQ: Negotiable
Price: Negotiable
Standard Packaging: Packed with plastic films and wrap with strips
Delivery Period: According to customer's requirement
Payment Method: Negotiable
Supply Capacity: Strong production capacity
Detail Information
Place of Origin
China
Brand Name
CEI-Kinte
Certification
ISO9001/FEM/ISO14001/OHSAS 18001
Model Number
Customized
EPC:
Engineering Procurement Construction
Press Shop:
Consulting
Body Shop:
Main/Closures/Floor/Sub-assembly/Metal Finishing
Paint Shop:
PT/ED Line/Primer Top Paint
Assembly Shop:
Trim/Sub-assembly/Testing
Engineering:
Plant Planning, R&D, SE
Production Capacity:
Improvement
Simulation:
PDPS
Overall Planning:
General Layout, Analysis Drawings
After-sale Service:
24/24 7/7
Minimum Order Quantity:
Negotiable
Price:
Negotiable
Packaging Details:
Packed with plastic films and wrap with strips
Delivery Time:
According to customer's requirement
Payment Terms:
Negotiable
Supply Ability:
Strong production capacity
Highlight

ISO9001 Automotive EPC

,

Automotive EPC ISO9001

,

ISO9001 Production Line Upgrade

Product Description

Introduction Of New Models

Introduction of new models for welding lines, to realize collinear production of new models and original models

 

Capacity Improvement

Improvement of line productivity, to convert and upgrade the low-beat lines to high-beat lines

 

Old Line Relocation

Introduction of new models for welding lines, to realize collinear production of new models and original models

 

Manual Operation Converted To Automatic Operation

Change manual operation to automatic operation. Transform the manual loading station into automatic loading station. Transform the manual welding station into automatic welding station. Transform the manual gluing station into automatic gluing operation, etc.

 

Intelligent Transformation

By incorporating MISP industrial big data system, the line beats can be optimized and the failure rate can be lower.

 

TRANSFORMATION PROCESS

01 Preparation Before Transformation

1. Full demonstration and innovation of process plan

2. Sufficient on-site surveying and mapping, logistics confirmation

3. Detailed construction plan

4. Rigorous project plan

5. Personnel and materials management

6. Standard project management; standard documents, SAP

 

02 Management During Transformation

1. Mobilization before construction

2. Daily work arrangement and confirmation

3. Safety management

4. Emergency plan

5. Logistics support, customer support, logistics support, customer support

 

03 Summary After Transformation

1. 24-hour production accompany

2. Quick response to problem points

3. Summary and standardization

 

Production Line Upgrade/Automotive EPC 0Production Line Upgrade/Automotive EPC 1