logo
products
PRODUCTS DETAILS
Home > Products >
Yaskawa Shougang Engine Room And Floor Turntable Project

Yaskawa Shougang Engine Room And Floor Turntable Project

MOQ: Negotiable
Price: Negotiable
Standard Packaging: Packed with plastic films and wrap with strips
Delivery Period: According to customer's requirement
Payment Method: Negotiable
Supply Capacity: Strong production capacity
Detail Information
Place of Origin
China
Brand Name
CEI-Kinte
Certification
ISO9001/FEM/ISO14001/OHSAS 18001
Model Number
Customized
R&D:
Professional R&D Team
Manufacturing:
In-house
Equipment:
Automation
Flexibility:
High
Conveyor Efficiency:
High
Maintenance:
Easy To Maintain
Service Life:
Long
Human Engineering:
Ergonomics
Highlight:

Automation Automotive Conveyor System

,

Automotive Conveyor System Automation

,

Automation automotive conveyors

Product Description

Yaskawa Shougang engine room and floor turntable project

 

As the carrier of automobile manufacturing, the conveyor line undertakes the tasks of assembly of auto parts, adjustment of interior appearance, safety inspection and function inspection. Arrange each module parts and standard parts according to a reasonable process, and assemble them into a qualified vehicle according to the specified technical requirements and quality requirements.

 

The final assembly conveyor line is composed of conveying equipment, transfer equipment and related auxiliary equipment, and the final goal is to assemble the vehicle for corresponding layout. The layout of the conveyor line has a decisive effect on the efficiency and logistics of assembly. Affected by investment planning and site, a variety of process layout methods have been formed. Common layout forms mainly include T-shape, T-shape, L-shape and so on. The conveying line mainly includes three main lines of interior decoration line, chassis line and final line and six sub-assembly lines of powertrain, front suspension, rear suspension, instrument, car door and tire to meet the process requirements.

 

Yaskawa Shougang Engine Room And Floor Turntable Project 0

products
PRODUCTS DETAILS
Yaskawa Shougang Engine Room And Floor Turntable Project
MOQ: Negotiable
Price: Negotiable
Standard Packaging: Packed with plastic films and wrap with strips
Delivery Period: According to customer's requirement
Payment Method: Negotiable
Supply Capacity: Strong production capacity
Detail Information
Place of Origin
China
Brand Name
CEI-Kinte
Certification
ISO9001/FEM/ISO14001/OHSAS 18001
Model Number
Customized
R&D:
Professional R&D Team
Manufacturing:
In-house
Equipment:
Automation
Flexibility:
High
Conveyor Efficiency:
High
Maintenance:
Easy To Maintain
Service Life:
Long
Human Engineering:
Ergonomics
Minimum Order Quantity:
Negotiable
Price:
Negotiable
Packaging Details:
Packed with plastic films and wrap with strips
Delivery Time:
According to customer's requirement
Payment Terms:
Negotiable
Supply Ability:
Strong production capacity
Highlight

Automation Automotive Conveyor System

,

Automotive Conveyor System Automation

,

Automation automotive conveyors

Product Description

Yaskawa Shougang engine room and floor turntable project

 

As the carrier of automobile manufacturing, the conveyor line undertakes the tasks of assembly of auto parts, adjustment of interior appearance, safety inspection and function inspection. Arrange each module parts and standard parts according to a reasonable process, and assemble them into a qualified vehicle according to the specified technical requirements and quality requirements.

 

The final assembly conveyor line is composed of conveying equipment, transfer equipment and related auxiliary equipment, and the final goal is to assemble the vehicle for corresponding layout. The layout of the conveyor line has a decisive effect on the efficiency and logistics of assembly. Affected by investment planning and site, a variety of process layout methods have been formed. Common layout forms mainly include T-shape, T-shape, L-shape and so on. The conveying line mainly includes three main lines of interior decoration line, chassis line and final line and six sub-assembly lines of powertrain, front suspension, rear suspension, instrument, car door and tire to meet the process requirements.

 

Yaskawa Shougang Engine Room And Floor Turntable Project 0