|
|
| MOQ: | Negotiable |
| Price: | Negotiable |
| Standard Packaging: | Packed with plastic films and wrap with strips |
| Delivery Period: | According to customer's requirement |
| Payment Method: | Negotiable |
| Supply Capacity: | Strong production capacity |
Typical Automotive CKD factory-Turkey factory
| Item | Content |
|---|---|
| Plant | Turkey factory |
| Scope | welding, painting, General Assembly shop |
| Welding | 2 model, Robot welding Automation line |
| GA shop | Conveyer (slider line, EMS line), sub assembly line (AGV), testing line, Filling equipment, manipulator, etc. |
| Painting | PT, ED, Painting system, conveyer system (Roller bed + Skids + EMS), waste water treatment system |
| Model | Sedan, SUV |
| Cycle time | 19 JPH |
![]()
|
|
| MOQ: | Negotiable |
| Price: | Negotiable |
| Standard Packaging: | Packed with plastic films and wrap with strips |
| Delivery Period: | According to customer's requirement |
| Payment Method: | Negotiable |
| Supply Capacity: | Strong production capacity |
Typical Automotive CKD factory-Turkey factory
| Item | Content |
|---|---|
| Plant | Turkey factory |
| Scope | welding, painting, General Assembly shop |
| Welding | 2 model, Robot welding Automation line |
| GA shop | Conveyer (slider line, EMS line), sub assembly line (AGV), testing line, Filling equipment, manipulator, etc. |
| Painting | PT, ED, Painting system, conveyer system (Roller bed + Skids + EMS), waste water treatment system |
| Model | Sedan, SUV |
| Cycle time | 19 JPH |
![]()