logo
products
PRODUCTS DETAILS
Home > Products >
Main Line/BIW Engineering

Main Line/BIW Engineering

MOQ: Negotiable
Price: Negotiable
Standard Packaging: Packed with plastic films and wrap with strips
Delivery Period: According to customer's requirement
Payment Method: Negotiable
Supply Capacity: Strong production capacity
Detail Information
Place of Origin
China
Brand Name
CEI-Kinte
Certification
ISO9001/FEM/ISO14001/OHSAS 18001
Model Number
Customized
R&D:
Professional R&D Team
Workshop:
Body Shop
Manufacturing:
In-house
Equipment:
Automation
Flexibility:
High
Sub-assembly:
Main Line/Bodyside/Closures/Floor Line Etc.
Welding:
Spot Welding/MAG MIG/Stud Welding Etc.
Layout:
CAD Drawing
Highlight:

High Flexibility BIW Engineering

,

BIW Engineering High Flexibility

,

ISO9001 biw design engineer

Product Description

MAIN LINE

 

Product Introduction

1. High-speed roller bed trolley transportation reduces non-process time and improves the utilization rate of process equipment

2. The windmill switching mechanism realizes the flexible switching of trolleys, and can realize random switching of 4 platforms, and the model introduction is convenient and fast

3. The standard flexible assembly system realizes random switching, and the line body width of 4 models is 18m

4. The main line and repair welding line use the form of in-line circulation to reduce the number of returned empty trolleys and reduce the number of second-story steel platforms

5. Including side wall pre-assembly, general assembly, top cover parts, laser, wheel cover piping, arc welding, repair welding, punching, online inspection and other modules

6. According to the product process, select the appropriate module to quickly generate the plan and corresponding process documents

 

 

The main line is the main welding and assembly line of the body in white. The assembly station of the production line will complete the assembly of the floor assembly and the side wall assembly and the top cover beam, and complete the connection of the top cover, rear wall and side wall at the other stations. Assembling and welding of multiple parts such as panels, a traditional body-in-white is formed on this production line.

 

The main station of the main line is the assembly station, which is also the most important station in the entire welding workshop. The assembly station is transported by robots, transported by slide rails, or combined to form a general tooling, The positioning of the fixture is fixed.

 

Features

The standardized and flexible production of the assembly station can realize the free switching of multiple models.

 

The fixtures and fixtures of the main line have a high repetition rate and are modularized.

 

Roller bed conveying, does not occupy the non-technical beat, and the equipment utilization rate is high.

Main Line/BIW Engineering 0Main Line/BIW Engineering 1Main Line/BIW Engineering 2Main Line/BIW Engineering 3Main Line/BIW Engineering 4

products
PRODUCTS DETAILS
Main Line/BIW Engineering
MOQ: Negotiable
Price: Negotiable
Standard Packaging: Packed with plastic films and wrap with strips
Delivery Period: According to customer's requirement
Payment Method: Negotiable
Supply Capacity: Strong production capacity
Detail Information
Place of Origin
China
Brand Name
CEI-Kinte
Certification
ISO9001/FEM/ISO14001/OHSAS 18001
Model Number
Customized
R&D:
Professional R&D Team
Workshop:
Body Shop
Manufacturing:
In-house
Equipment:
Automation
Flexibility:
High
Sub-assembly:
Main Line/Bodyside/Closures/Floor Line Etc.
Welding:
Spot Welding/MAG MIG/Stud Welding Etc.
Layout:
CAD Drawing
Minimum Order Quantity:
Negotiable
Price:
Negotiable
Packaging Details:
Packed with plastic films and wrap with strips
Delivery Time:
According to customer's requirement
Payment Terms:
Negotiable
Supply Ability:
Strong production capacity
Highlight

High Flexibility BIW Engineering

,

BIW Engineering High Flexibility

,

ISO9001 biw design engineer

Product Description

MAIN LINE

 

Product Introduction

1. High-speed roller bed trolley transportation reduces non-process time and improves the utilization rate of process equipment

2. The windmill switching mechanism realizes the flexible switching of trolleys, and can realize random switching of 4 platforms, and the model introduction is convenient and fast

3. The standard flexible assembly system realizes random switching, and the line body width of 4 models is 18m

4. The main line and repair welding line use the form of in-line circulation to reduce the number of returned empty trolleys and reduce the number of second-story steel platforms

5. Including side wall pre-assembly, general assembly, top cover parts, laser, wheel cover piping, arc welding, repair welding, punching, online inspection and other modules

6. According to the product process, select the appropriate module to quickly generate the plan and corresponding process documents

 

 

The main line is the main welding and assembly line of the body in white. The assembly station of the production line will complete the assembly of the floor assembly and the side wall assembly and the top cover beam, and complete the connection of the top cover, rear wall and side wall at the other stations. Assembling and welding of multiple parts such as panels, a traditional body-in-white is formed on this production line.

 

The main station of the main line is the assembly station, which is also the most important station in the entire welding workshop. The assembly station is transported by robots, transported by slide rails, or combined to form a general tooling, The positioning of the fixture is fixed.

 

Features

The standardized and flexible production of the assembly station can realize the free switching of multiple models.

 

The fixtures and fixtures of the main line have a high repetition rate and are modularized.

 

Roller bed conveying, does not occupy the non-technical beat, and the equipment utilization rate is high.

Main Line/BIW Engineering 0Main Line/BIW Engineering 1Main Line/BIW Engineering 2Main Line/BIW Engineering 3Main Line/BIW Engineering 4